In
this post we will discuss all about Caisson Foundation and Well Foundations that what is Caisson Foundation and Well Foundations . Well
foundation are a like well and they are constructed in location with water.
Caisson foundation is call pier foundation .
What is well Foundations and caisson foundation with diagram ?
Well
foundation are a like well and they ate constructed in location with water.
Well foundation are generally constructed beneath the bridge or they are
constructed building situated close to sea bank . well foundation are shallow
form inside a constructed with brick masonry. Will foundation are also
constructed with R.C.C with depth is higher and intended load excessive . they
are making in square type, circulate type and oval type. Many well of required
form are digged out for this type foundation
Well
kerb is constructed below well that is mad of R.c.c or steel . this is used for
cutting well kerb which facilitates in soil digging . brick walls of R.c.c are
constructed over the well kerb. Cement conceret (1:4:8) in put in to lower tier
of well.this concrete is call bottom plug. Soil is spread and put over the
bottom plug and it is filled with concrete (1:2:4) and top is sealed . this
concrete is known as top plug. Layer of frim concrete is put over it which is
called R.c.c pier or wall is constructed over it.
Also read these posts
Also read these posts
Caisson
foundation is call pier foundation . caisson is a cylinder or hollow box that is sunk into the ground to a specified
depth by auguring a deep hole in to the strata the cylinder or box is then back
filled with concrete thus creating the foundation . this type of foundation is
most often used when constructing bridge piers and other such foundation that
will be beneath bodies of water since the caissons can be floated to the
correct locations and then sunk in plave using
concrete . this type of foundation with keep the soils underneath the
building or structure from moving vertically. Since soil with settle over time
, the building or structure from moving vertically . since soil with cause
major structural damage . since assassin foundation is drilled into the earth
any large concrete filled cylinders are placed with the ground rather than on top the settlement
of he soil will not or use many difficulties for the buliding for the building
or structure .