Method of Traversing in Surveying

 Traverse Surveying is a Famous Procedure of surveying. This post include definition of traverse surveying along with its Types,errors in traversing, checks, the completed method of traversing and plotting of traverse survey.

Method of Traversing in Surveying on Total Station

 

using CX 101 ,102 , 103 , 104 , 105 , 107 Total station
First of all set the total station on station point . then level the machine vertical form tripod and horizontal leveling form leveling screw in total station .
After completing that process attached the battery with total station and press "ON" button for ON total station then press the co-ord option with the help of function key and load the station data.
For example
                      N   =  5000
                      E    =  4000
                   H.inst  = 2.234
                   H.target = 1.650
                        and press ok with help of function key .
Traversing in Surveying


Then make a job (click here to know how can create a job in total station)
Now if you want to taransfer the station  point then you must be read the coordinate of that point where you want to transfer station point .



Related posts survey

Traverse Method / Survey Traverse Procedure
How to Measure a Bearing / Bearings Measurement
Closed Traverse Survey Method With Example
WHAT IS TOTAL STATION OR TS
What Is Coordinate And Its Types
Coordinate Measuring on Total Station / finding co...
what's Natural surface level and how to find it
How to Calculate Curve Using Curve Formula
Coordinates And Its Types With Diagram
How to Calculate Curve Using Curve Formula
Methods of Topographic Survey on Total station
How to find Area of Land Using Total Station 

For example
        if we have two points ''A'' and point ''B'' point A is your station point and point B is the point where you want to transfer the station point .You must be read the coordinate first of point B record it  then OFF the Total station and shift it to point B and set on the point ON'' the Total station and level the instrument horizontal and vertical as i have write you above procedure .
Traversing in Surveying

And again go to OCC orientation and load the coordinate of that point . then go to Bs -Nez and enter the first point coordinate and recorded it .
now that point will  our station point . for checking traversing we will go to Observation  . and read the last point coordinate . If the coordinate is same then the traverse is accurate.
Millimeter difference can come in close traverse.

 You might read these post


What is Transporting Ways
Parts of transporting Ways with Diagram
SIMPLE ROAD STRUCTURE DESIGN
Type of Transport Ways
MOQADDAR KHAN SALGARY
PUBLIC HEALTH COURSE CONTENTS
Top Biology Entry Test Question And Answer

Thank you for reading this post Method of Traversing in Surveying .i hope you will understand this method it is very easy if you want to do traversing in surveying then look the link in upper related post. and if you have any problem then contact us or comment us through comment section .